• Wh180 Concrete Ride on Power Trowel
  • Wh180 Concrete Ride on Power Trowel
  • Wh180 Concrete Ride on Power Trowel
  • Wh180 Concrete Ride on Power Trowel
  • Wh180 Concrete Ride on Power Trowel
  • Wh180 Concrete Ride on Power Trowel

Wh180 Concrete Ride on Power Trowel

Type: Power Trowel
Object: Asphalt Concrete Pavement
Moving Type: Mobile
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Wh180 Concrete Ride on Power Trowel pictures & photos
Wh180 Concrete Ride on Power Trowel
US $480-500 / Piece
Min. Order: 3 Pieces
Manufacturer/Factory & Trading Company
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (22)
  • Overview
  • Company Profile
Overview

Basic Info.

Model NO.
WH180
Mixing Method
Intermittent Compulsory
Automatic Grade
Semi-Automatic
Certification
CE
Condition
New
Colour
Yellow
Transport Package
Carton
Specification
Standard
Trademark
ANT
Origin
Jiangsu, China(Mainland)
HS Code
8479109000
Production Capacity
400 Units/Month

Packaging & Delivery

Package Size
175.00cm * 95.00cm * 110.00cm
Package Gross Weight
205.000kg

Product Description

Concrete ride on power trowel WH180 with CE

Specification

Model WH180(ride-on)
Engine type 13HP 4-stroke,1cylinder,OHV,air-cooled
Engine Honda, B&S and Loncin
Engine speed 3600rpm
Working diameter 1350mm
Speed 60-100rpm(with pan disc) /125-140rpm (with blade)
Blade adjustment 0-15°
Packing 
Weight 205kgs
Dimension 1750*950*1100mm
20GP 5PCS
40GP 11PCS

Features
1.Chrome plated height adjustable handle comfort and easy control for operator.
2.Dead-man switch assures operator's safety and easy control.
3.Stabilizer ring reduces blade chatter.
4.Optional Blue blade is thicker than ordinary blades and, combined with its ability to flex slightly, performance is improved and blade life prolonged.
5.Lifting tube allows trowel to be transported on the job-site with only two people.
 

Thanks for your time!
For more details,don't hesitate to contact me.

Wh180 Concrete Ride on Power Trowel
Wh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power Trowel

Company Profile

Wh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power TrowelWh180 Concrete Ride on Power Trowel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Wh180 Concrete Ride on Power Trowel pictures & photos
Wh180 Concrete Ride on Power Trowel
US $480-500 / Piece
Min. Order: 3 Pieces
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Year of Establishment
2018-11-06
Plant Area
3500 square meters